Innovative Solid-State Battery Pilot Lines

Professional solid-state battery pilot line solution services. TOBGROUP ensures smooth transition from pilot line to mass production line with expert guidance. We offer tailored equipment, facility design, and staff training for successful pilot production.

Innovative Solid-State Battery Pilot Lines

Capacity(≥)
0 cells/day
Quality rate(≥)
0 %
Utilization rate(≥)
0 %
Professional Pouch Cell Lab Line Solution

Product Description

TOBGROUP focuses on the industrialization bottlenecks of solid-state batteries (SSB), offering a full-stack solid-state battery pilot line solution. We deeply integrate solid electrolyte integration, interface modification, and dry electrode technology, providing a critical bridge from lab line to mass production for sulfide/oxide/polymer systems, overcoming the three core challenges: ionic conductivity, interface contact, and scalable manufacturing.

●  Precise Capacity: 300–1500 cells/day (Supports phased expansion, adaptable for material validation → process locking → small batch delivery needs)

●  Specification Compatibility: Thickness 2mm–15mm (Supports multi-layer stacking design), size compatible with full range of pouch cell/stacked form factors from 50x70mm to 150x200mm

●  Core Process Coverage:
(1) Continuous Solid Electrolyte Membrane Preparation (Casting/Spraying/Hot Pressing)
(2) Integrated Dry/Mixed Electrode Forming
(3) Precise Multi-Layer Electrode-Electrolyte Stacking
(4) In-Situ Curing / Hot Pressing Integration for Solid Interfaces
(5) High-Pressure Encapsulation (No Electrolyte Filling Process)
(6) Formation & Aging (Pressurized/High-Temperature Aging)
(7) Full-Channel Electrochemical Testing and Failure Analysis

Technical Specifications

TOBGROUP Solid-State Battery Pilot Line Standard Configuration with Full Customization Support

Parameter Item

Standard Config / Range

Customization Capability Description

Standard Output Capacity

800 cells/day

300–1500 cells/day (Adjustable stacking layers)

Supported Cell Thickness

3mm–12mm

2mm–15mm (Multi-layer cells)

Electrolyte Membrane Thickness

10–100μm

5–200μm (Sulfide/Oxide/Polymer)

Stacking Accuracy

±0.1mm

Supports >30 layers ultra-thin stacking

Hot Press Pressure Range

10–80MPa

5–100MPa (With real-time interface impedance monitoring)

Encapsulation Chamber Vacuum

≤5×10⁻³Pa

Supports inert atmosphere (Argon) encapsulation

Data Acquisition Points (MES)

300+

Includes in-situ impedance, pressure distribution, temperature gradient

Environmental Control

H₂O≤0.1ppm, O₂≤0.1ppm (Sulfide)

Full-line glove box / Localized inert atmosphere chamber customization

Typical Delivery Lead Time

24–32 weeks

18–40 weeks (Adjustable based on system complexity)

Advantages & Technical Features

TOB Solid-State Battery Pilot Line: Bridging Lab to Mass Production

●  Dedicated All-Solid-State Process Platform
(1) Integrated continuous dry electrode film forming system (Powder dispersion → Mixing → Hot pressing), avoiding solvent erosion of solid electrolytes.
(2) Utilizes multi-stage hot pressing interface fusion technology (Pressure 5–100MPa, Temperature RT–200°C controllable), significantly reducing interface impedance.
(3) Supports thin-film coating (≤20μm) and damage-free transfer lamination for sulfide/oxide/polymer electrolytes.

●  Mass Production-Ready Data Closed-Loop System
(1) Embeds SSB-dedicated MES, monitoring key parameters in real-time: electrolyte film thickness uniformity (CV≤3%), interface contact pressure, hot press temperature profile, interface impedance evolution, etc.
(2) Combines in-situ impedance analysis and CT scan data to build interface contact-electrical performance correlation models, defining mass production process windows.

●  Zero-Electrolyte-Filling High-Reliability Encapsulation
(1) Fully automatic multi-chamber pressurized encapsulation machine (Vacuum ≤10⁻³Pa, Pressure accuracy ±0.5MPa), addressing the air-tightness challenge of SSBs.
(2) Compatible with aluminum laminate film/metal case encapsulation, meeting high energy density and extreme safety requirements.

●  Seamless Mass Production Design
(1) Core equipment (Dry film forming machine, Hot press, Pressurized encapsulator) shares the same underlying technology platform as mass production lines.
(2) Process parameters (Hot press pressure/temperature profiles, stacking accuracy, interface activation regimen) can be directly extrapolated to GWh-scale production lines.

End-to-End Implementation Process

From solid-state technology blueprint to stable sample delivery, TOB empowers the entire journey.

Phase

Core Deliverables

Technology Roadmap Planning

Evaluate electrolyte system (Sulfide/Oxide/Polymer), electrode-electrolyte integration solutions, target energy density/cycle life.

Line Custom Design

Provide dry/wet process compatible layout, inert atmosphere glove box integration solutions, explosion-proof hot press zone isolation design.

Core Equipment Supply

Supply custom dry electrode integrated machine, solid electrolyte coater, automatic stacking hot press, pressurized vacuum encapsulator, in-situ activation system.

Process Debugging & Optimization

TOB engineers lead interface modification process commissioning (e.g., Li interface layer deposition), hot press parameter envelope verification.

Technology Transfer & Training

SOPs for SSB-specific processes (e.g., sulfide moisture-proof handling), equipment maintenance, failure analysis tool application.

Continuous Upgrade Support

Provide electrolyte material iteration adaptation, mass production line parameter conversion consulting, joint development agreements.

 

Key Equipment Showcase

Core enablers of technological implementation

Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater
Precision Compact Dual-Side Coater

Frequently Asked Questions

Actionable insights from planning to execution

●  No Electrolyte Filling Process: Eliminates electrolyte filling/soaking equipment; adds hot press integration and interface activation modules.

●  Upgraded Environmental Control: Sulfide lines require full-chain H₂O/O₂ ≤0.1ppm (increases cost share by ~30%).

●  Increased Encapsulation Pressure: Encapsulation pressure increases from ~0.5MPa for liquid electrolytes to 5–50MPa.

●  Process Side: Uses multi-stage gradient hot pressing (Programmable temperature/pressure profiles) + in-situ curing layers (Li-alloy interface layer deposition equipment).

●  Equipment Side: Integrates real-time impedance monitoring modules, automatically feedback-adjusting hot press parameters.

●  Material Side: Provides pre-lithiated anode / surface-modified electrolyte supporting solutions.

●  Environment: Requires independent dust control chamber (ISO Class 5 cleanliness).

●  Equipment: Equipped with powder electrostatic elimination system, precision feeder (Accuracy ±0.1g).

●  Safety: Full-process inert atmosphere explosion-proof design (PTFE powder ignition point ≤450°C).

RELATED CASES

TOBGROUP delivered a 3000F 60138 supercapacitor pilot line with full equipment, materials, and on-site commissioning support.

TOBGROUP designed a Na-ion battery lab line producing 18650S, 32138S, 32140S cells for advanced research and development.

TOBGROUP delivered a full-cycle 5MWh pouch cell production line for Li-ion and Na-ion, enabling European energy storage production.

get in touch with us

    Your message*

    Leave Your Message

      Your message*